What We Do

Services

Here's everything we do, from a first-time build to fixing what's already there.

HomeServices

Everything we take on

Every job below is one we do ourselves across Madera.

Deck Installation

We build new decks from the footings up, sizing joists and beams to the actual span and load instead of eyeballing it. Ledger boards get flashed properly where they meet your house, since that's the spot most decks start rotting from the inside. We'll walk you through wood versus composite before we pour a single footing.

Deck Repair

A deck that bounces, a rail that wiggles, or boards that have gone soft usually points to something underneath, not just the surface. We check joist hangers, post bases and the ledger connection before we replace a single board. Sometimes a repair is a few sistered joists, sometimes the whole frame needs to come off.

Deck Staining & Sealing

Madera sun checks and grays untreated wood fast, sometimes within a single season. We pressure wash first, let the deck dry out fully, then apply a semi-transparent or solid stain depending on the wood and how much sun it gets. Plan on recoating every one to two years if you want it to keep looking new.

Composite Decking

Composite boards like Trex or TimberTech don't need staining and won't splinter, but they still sit on a wood or steel frame that has to be built right underneath. We use hidden fastener systems for a clean look and leave the gapping composite needs to handle heat expansion.

Custom Deck Design

Multi-level decks, built-in benches, lighting run through the railing, whatever the yard calls for, we design around how you'll actually use the space. We draw it out and price it before any lumber gets ordered.

Deck Railing Installation

Railings get built to the height and baluster spacing code requires, usually 36 to 42 inches with no gap wider than 4 inches. Wood, metal and cable rail all attach differently to the deck frame, and we size the posts to whichever one you pick.

Deck Board Replacement

When boards have cupped, split or gone soft in spots but the frame underneath is still solid, we pull and replace just those boards. We match spacing and profile to the rest of the deck so it doesn't look patched.

Deck Framing & Structural Repair

Rot at the ledger, a post base that's rusted through, or a footing that's heaved from clay soil movement, this is the work that decides whether a deck lasts another twenty years or five. We sister joists, replace post bases and repour footings where the old ones weren't set deep enough.

Deck Stairs & Steps

Stringers get sized for the actual rise and run, not a standard box kit, and every step lands on its own footing or landing pad. Steep stairs and mismatched rise heights are the most common way people trip on a deck.

Pergolas & Shade Structures

A pergola attached to an existing deck needs its own posts and footings, it can't just hang off deck framing that wasn't built to carry that load. We size the structure separately and tie it in clean.

How It Works

Four steps, and no surprises in any of them.

01

We come and look

You tell us what you want doing, we look at what is actually there, and we ask the awkward questions early.

02

You get a price

In writing, itemised, free. If something might add cost later we flag it now rather than at the end.

03

We do the work

Same crew throughout. We cover your floors, keep the dust down and tidy up before we leave each day.

04

We walk it with you

You point out anything you are not happy with and we fix it before the invoice, not after.

Where We Work

All of this, across Madera, CA

This is the ground we build on, from Madera out through the valley.

Madera, CA
Fresno, CA
Clovis, CA
Merced, CA
Sanger, CA
Reedley, CA
Selma, CA
Chowchilla, CA
Kerman, CA
Kingsburg, CA
Oakhurst, CA
Common Questions

Things worth asking

Questions that come up once a project actually gets moving.

Do I need a permit to build a deck?
Most decks attached to a house, and any deck more than 30 inches off the ground, need a building permit in California, which covers footing depth, joist spacing and railing height. A low, freestanding deck may not need one, but checking with the local building department before starting avoids problems at resale.
How long does it take to build a deck?
A standard single-level deck around 250 to 400 square feet usually takes one to two weeks from footings to final board, weather and permit timing aside. Multi-level decks, decks with a lot of stairs, or jobs waiting on a permit inspection take longer.
Can you build a deck to fit a specific budget?
Size, material and railing style can all be adjusted to hit a target budget, and it's worth raising that during the quote stage. Cutting square footage or switching from composite to pressure-treated lumber are the two changes that move the number the most.
What kind of guarantee comes with the deck work?
Workmanship on framing, footings and installation should be covered by the contractor for a set period after completion, separate from the manufacturer's warranty on the decking material itself. Specific terms should be requested in writing before the job starts.
Who will I actually be dealing with during the project?
On most deck jobs, the same crew that frames the deck also finishes the railing and boards, so there's one point of contact rather than a rotating cast. Schedule changes or issues that come up mid-job get communicated directly, not through a third party.
What decking material should I choose?
Pressure-treated lumber costs less upfront but needs staining every one to two years and will eventually need boards replaced as it weathers. Composite decking like Trex or TimberTech costs more initially, doesn't need staining, and holds up better against the sun, but still needs a properly built frame underneath.
Can I still use my yard while the deck is being built?
Most of the yard stays usable during construction, though the immediate work area needs to stay clear for safety and to keep materials and tools organized. Access for delivery trucks and equipment gets discussed during the estimate if the yard is tight.
How should I prepare my yard before deck construction starts?
Clearing furniture, planters and anything breakable away from the build area helps a crew move faster on day one. Marking the location of any sprinkler lines or buried cable helps avoid hitting them when digging footings.
What happens if you find rot or a problem once the old deck comes off?
If old framing, a rotted ledger board or a bad footing turns up once demo starts, that gets flagged and priced before work continues rather than getting covered up. It's common on older decks, especially ones where the ledger was never flashed properly to begin with.
How do I take care of a new deck to make it last?
Wood decks need restaining every one to two years depending on sun exposure, plus a yearly check of railings and fasteners for looseness. Composite decking needs occasional washing but no staining, though gaps between boards should stay clear of debris so water keeps draining through.

Not sure what you need?

Describe the problem and we will tell you what it probably is. No obligation.

Call (559) 545-0768